avatarDay 23 – You can almost hear the water lapping at the pool-side!

Yesterday the service locale  was just about finished (it just needs a roof). Today the guys laid 19 m3 of concrete around the pool to support the tiles and keep the areas around the service locale neat and tidy.

P1000142

This entry was posted in General News. Bookmark the permalink.